Oil&Gas
Elixier - Mirfa Plant to Habshan Field Pipeline
2017-12-21 15:00  点击:1
VIP:1级

Project Profile


Location: Mirfa to Habshan
Length: 45-kilometre-long, 48-inch diameter pipeline
Production: production capacity is 670,000 Nm3/h of gaseous nitrogen
Start-up Year: June 2011

The project calls for construction 45-kilometre-long, 48-inch-diameter pipeline linking Mirfa with Habshan oil field. The pipeline will carry nitrogen from Elixier\'s facilities at Mirfa to Habshan.

The two nitrogen units will have a capacity of 670,000 cubic metres per hour upon completion.

The nitrogen transported will be injected into existing production wells to maintain reservoir pressure and improve oil flow in the onshore condensate field in Habshan.

The project is expected to be completed June 2011.

Operator:

Elixier Joint Venture: Operator with 100% interest

Abu Dhabi National Oil Co (ADNOC)
Linde Group

Contractor:

Dodsal Group: Construction of pipeline
联系方式