Hadera Deepwater LNG Terminal
2019-01-17 19:48  点击:1
VIP:1级

Project Profile


Value: US$300 Million
Startup Year: 2013
Capable Delivery Rate: 600 MMcf/d
base load Capacity: 500 MMscf/d
import Capacity: 2.5bcmpa
Location: Offshore Hadera, Haifa District

The project will see the proposed construction of an LNG terminal with first-phase send-out capacity of around 4 billion cubic metres per annum (400 million cubic feet per day or 2.9 mtpa), which could be doubled in a further expansion.

The proposal overseen a permanent platform and a FRSU to convert the LNG back into gas. The receiving facility is located just off the Mediterranean coast at Hadera. The facility is to be located 2.5 km offshore and will be adjacent to the coal unloading terminal of the Israel Electric Corp. Hadera has access to Israel\'s subsea western loop pipeline.

The BOT tender includes the construction of the LNG terminal and its operation for 20-30 years, in exchange for regular royalties to be financed by gas transportation proceeds.



Operator/Developer:

Israel Natural Gas Lines (INGL)

Excelerate Energy

Contractors:

Poten & Partners: Feasibility study

Zeus Energy Consulting: Management consultancy