Oil&Gas
Farha South and East Saiwan oil Fields
2020-08-10 17:28  点击:1
VIP:1级

Project Profile


Value: US$1.6 billion
Startup Year: 2015
Location: Al Wusta (OM) Block 15

The Saiwan East-3 has flowed at rates close to 11,000 barrels per day during production tests of the horizontal section drilled in the Khufai reservoir. The Khufai reservoir target was hit at 38 metres higher than in the Saiwan East-2 discovery well.

Operators:

CC Energy: Operator with 50% interest

Tethys Oil: 30% interest

Mitsui & Co.: 20% interest

Contractors:

KCA Deutag: Drilling contractor

Gaffney, Cline & Associates (GCA): Consultants
联系方式