Project Profile
Value: US$6,000 million
Location: Assaluyeh, Booshehr (onshore), Persian Gulf (Offshore)
Production: 104 MMscm/d of gas
The development project for phases 6, 7 & 8 has been designed to produce 104 MMscm/d of gas from the reservoir which is going through its final construction steps.
This project is divided into onshore and offshore sections. The onshore section is located in Assaluyeh in the state of Booshehr and the offshore is 105 Km’s in the sea of the Persian Gulf. onshore activities include site preparation and construction of the refinery, whereas the offshore section consists of 3 appraisal wells (one for each phase), 27 development wells (9 for each phase) and the offshore facilities.
In October 2002, Statoil ASA was awarded operatorship of the offshore upstream portion of Phases 6, 7 and 8, which included the construction and installation of three production platforms, the drilling and hook-up of 30 wells, and the installation of three 32-inch-diameter, 105-kilometre subsea pipelines to shore.
The fabrication and installation of jackets was awarded through an EPC contract to ISOICO an Iranian company, which started its activities on July 2002 and completed in January of 2004.
Sadra an Iranian company was awarded the Engineering, Procurement and Construction of topsides, jackets, flares, intermediate-bridges, installation of 32 inch pipelines for a length of 105 Km, SPM and its connecting pipelines through an EPC contract. These activities were performed on Sadra’s industrial island in Booshehr.
Site preparation for the refinery was started on December 2001 and completed on December 2003 by Fater Kosaran Jonoob and Abad Rahan Pars. This project consisted of over 15 million square meters of soil work. The refinery project was awarded through an EPC contract to the consortium of TIJD which include; TOYO of Japan, IDRO of Iran, JGC of Japan and Daelim of Korea on May 2002.
The power plant for the refinery was awarded to Petropars in addition to the original service contract of phases 6,7&8 and was handed over through an EPC contract to Hirbodan an Iranian company to the design, installation and commissioning of the power plant which includes gas turbines and spare parts with capacities of up to 160 Mega Watts.
The total project management of this project is the responsibility of Petropars which also oversees the management of Statoil the offshore operator.
Operator:
Statoil ASA: Offshore operator
Pars Oil and Gas Company (POGC)
Contractors:
Doris Engineering: EPC contract for jackets
ISOICO: EPC for fabrication and installation of Jackets
Sadra: EPC of topsides, jackets, flares and intermediate bridges
Shipham Valves: Swing check and gate valves in nickel aluminium bronze materials for the sea water fire fighting ring main
EPC consortium for refinery project:
TOYO
IDRO
JGC
Daelim
Petropars: EPC for power plant