Project Profile
Value: $100 Million
Startup Month: Q4
Startup Year: 2012
Storage Capacity Liquids: 580,000 m³
Location: Fujairah (UAE)
The project will see the construction of a 580,000 m3 storage facility in Fujairah, UAE. 75% of the tank capacity at the terminal will be dedicated to dark fuel, which could include some commercial crude storage, with the remaining 25% set aside for clean petroleum products.
Operators:
Chemoil Energy: Operator with 40% interest
Gulf Petrol Supplies: 60% interest
Contractors:
Mott MacDonald: Consultancy
Topaz Engineering: EPC