Project Profile
Value: US$700 million
Location: Abu Dhabi
Start-up Year: Q4 2012
The project involves the construction of approximately 955 km of pipelines ranging from 10–28 inch diameter, with the main part of the contract being the construction of a 230 km pipeline linking the Abu Dhabi refinery with Takreer’s Ruwais refinery.
The pipeline has been designed to establish a reliable and safe network of pipelines for hydrocarbon product movement between the refineries and storage terminals for commercial distribution. It will connect several major regional hubs including; Ruwais Refinery and Abu Dhabi refinery with Musaffah Terminal (central products distribution hub), Abu Dhabi international Airport, Al Dhafra Airbase, Al Ain Terminal, Madinat Zayed Terminal and Shuweihat Power Plant.
The pipelines and terminal facilities under the IRP-II shall be fully operational in March 2014.
Operator:
Abu Dhabi Oil Refining Company: Operator with 100% interest
Contractors:
GS Engineering & Construction Company Ltd: EPC contract
Penspen International: Feasibility study
Technip Abu Dhabi: FEED contract
Tebodin Consultants & Engineers: PMC contract
Subcontractor:
CLYDEUNIOn: Supply pumps for installation on the TAKREER Inter Refinery Pipelines
Essar Projects: construction of twin Inter Refinery Pipelines awarded by GS Engineering & Construction Company
Saudi Steel Pipe Company Ltd: Supply ERW pipes
Robt. Stone