Oil&Gas
Gulf Farabi - Jubail Linear Alkyl Benzene (LAB) Plant Expansion
2017-12-21 15:00  点击:0
VIP:1级

Project Profile



Value: Undisclosed
Location: Jubail Industrial City, Jubail Al Sharqivah, Saudi Arabia
Start-up Year: March 2012
Capacity: 100,000 tpy

The new plant will have a production capacity of 100,000 tpy of LAB which is a basic ingredient in the formulation of synthetic detergents. The first phase of the project covers the preparation and issue of an invitation to bid (ITB) for the engineering, procurement and construction management (EPCm), EPCm bid evaluations, preparation of the EPCm contract and support to Gulf Farabi during the engineering and procurement phase of the project. For the second phase, Foster Wheeler will provide support to Gulf Farabi during the construction phase, with key personnel based at site in 2010 through to 2011 when the project is scheduled for completion.

Operator:

Gulf Farabi Petrochemical Company: Operator with 100% interest

Contractors:

Foster Wheeler: PMC contract

Saudi Binladin Group: Construction contract

SNC-Lavalin Arabia, LLC: EPC contract for the plant

Uhde: EPC and management contract

UOP Saudi Arabia: Supply package
联系方式