Project Profile
Location: Cameroon, Douala/Kribi-Campo
Area: 1,289-square-km
Project value (m): US$17.56 million
Kosmos Energy will in six years undertake a work programme on the Fako Block in three phases of two years each renewable as per the prescriptions of the Petroleum Code. This, among others, consists in carrying out geoscience studies, acquiring gravity gradiometric and magnetic data as well as studies for the initial phase of two years. It will also acquire, process and interpret 100 km of 2D seismic data or the drilling of one exploration well during the second phase as well as the drilling of an exploration well during the third phase.
Operator:
Kosmos Energy: Operator with 100% interest