Borouge Petrochemicals Project
2020-07-30 15:19  点击:3
VIP:1级

Project Profile


Value: US$3,500 million
Completion Date: 2014
Capacity: 2.5 Million tons/year
Location: Ruwais, Abu Dhabi

The Borouge petrochemicals project Phase 3 is expected to increase capacity by 2.5 million tons/yr. The components of the Borouge 3 project include a 1.5 million tonne/year ethane cracker that will produce basic chemical feedstocks for the polyethylene and polypropylene plants, two polyethylene units with a capacity of 1.08 million tonne/year, two polypropylene units with output of 900,000 tonne/year and a 350,000 tonne/year low density polyethylene unit.

Four contracts available for the project include:

The ethane cracker
The LDPE units.
Offsites and utilities
Polyolefins


Operator:

Abu Dhabi Polymers Company (Borouge)


Contractors:

Al Asab General Contracting Est.: Site preparation EPC contract

Alpine Bau: Non-process buildings

Bechtel: PMC contract

Cape: Thermal insulation

Consortium for Ethane Cracker EPC:

Consolidated Contractors International Company (CCC)
Linde Group

Consortium for polyeolefins, Low Density Polyethelene Unit (LDPE) and building works EPC:

Maire Tecnimont
Samsung Heavy Industries

Hyperion: IT FEED project

Honeywell: Main automation contractor

Hyundai Engineering & Construction Co Ltd.: Cross-linkable polyethylene (XLPE) unit EPC contract

Hyundai Heavy Industries (HHI): Offsites and Utilities EPC contract

Jacobs: Compunding, soaking and product handling line FEED contract

Maire Tecnimont SpA: Main FEED contractor

WorleyParsons: 3rd expansion of olefins feasibility