Oil&Gas
Monaco pipeline
2017-12-21 15:00  点击:1
VIP:1级

Project Profile


Value: US$222 million
Location: Burghausen (German-Austrian border) – Finsing (Bavaria, Germany)
Start-up year: Autumn 2018

The pipeline will pump gas from Austria\'s Haidach storage facility into Germany. The project will begin from Burghausen and will run 86.5 km long high-pressure gas pipeline through the Bavarian districts of Altotting, Muhldorf, ending in Finsing.

The main purpose of the MONACO gas transmission is to maintain the security of supply for Bavaria and Germany as well as to increase the flexibility of gas supply in the German natural gas transport network.

Operators:

bayernets GmbH

bayerngas GmbH, holds 59.1% of the shares in bayernets GmbH, Stadtwerke München GmbH have acquired 32.4% and Stadtwerke Augsburg Holding GmbH has 8.5%.

Contractors:

ILF Consulting Engineers: Contracted for technical and ecological supervision services, claim management, safety and health coordination services and supervision of commissioning.
联系方式