Eastern Trough Area Project (ETAP)
2017-12-21 15:00  点击:2
VIP:1级

Project Profile


Value: US$1 billion
Location: 240km east of Aberdeen, Scotland, Central North Sea
Area: 35km
Reserves: 490 MMbbls of oil, 35 MMbbls of natural gas condensate and 56.6 mcm of natural gas
Start-up Year: July 1998

The Eastern Trough Area Project (ETAP) is an integrated development of nine different reservoirs sharing a central processing facility (CPF). Six separate fields are operated by BP: Marnock, Mungo, Monan, Machar, Mirren and Madoes (the M fields); and three by Shell: Heron, Egret and Skua fields (the Heron cluster). All fields are geographically located within a 35km area. The various fields are grouped into six areas called clusters. BP operates on a day-to-day basis, while Shell remains responsible for any drilling, reservoir intervention or non-routine maintenance.

Each field is not commercially viable for standalone developments because of their small scale. Their combined reserves are estimated to be around 490 million barrels of oil, 35 million barrels of natural gas condensate and around 2 billion cubic feet of natural gas. The ETAP project began production in July 1998 with seven reservoirs. The additional two reservoirs - Mirren and Madoes - started production in 2002. In August 2015 the project received a US$ 975m investment by BP. The funding is expected to extend the life ETAP by 15 years, through to 2030.


Operators:

BP

Shell


Contractors:

KBR: Conceptual Design, FEED and PM. (1998)

Bibby Offshore: Installation of new subsea control system infrastructure to safeguard power and communication links to Machar, Madoes and Mirren fields. From April 2016, Bibby Offshore provides dive support and construction support vessels to deliver umbilical installation, trenching, structure installation and commissioning through to final survey of the completed workscopes. (December, 2015)

Pittsburgh Corning: Platform insulation with FOAMGLAS® ONE™ Insulation. (January, 2016)

Aquatic Engineering & Construction: Replacement of subsea infrastructure and provision of lay equipment and personnel for riser installation (May, 2016)

Bibby Offshore (15-day project) - the supply of air and saturation diving support to perform operations including spool and flowline disconnection, evaluation and installation of conductor clamp guides, alignment clamp installation and modifications to a gas lift system. (July, 2016)

Prosafe: Accommodation support

Amec Foster Wheeler: EPC contract by BP for the provision of additional living quarters, as part of BP’s life extension project on the ETAP


Subcontractors:

Fugro: Contract for Q1400 trencher to bury an umbilical at the BP ETAP redevelopment. (June, 2016)