Project Profile
Location: from the Shetland Gas Plant to the FUKA pipeline, UK
Length: 234 kilometres
Capacity: 665 Mmscf/d
Start-up Year: 2012
The Shetland Island Regional Gas Export System (SIRGE) is a 234-kilometer, 30” gas pipeline with a capacity of 665 Mmscf/d connecting the Shetland Gas Plant to the FUKA pipeline. Initially, Total held a 67% operated interest in the SIRGE pipeline alongside Dong E&P (UK) Limited (18.3%), Chevron North Sea Limited (7.2%) and OMV (UK) Limited (7.5%). From August 2015, following the completion of the sale, North Sea Midstream Partners acquired Total’s interest and will have an agreement with px Group for the operation and maintenance of the asset.
Operators:
North Sea Midstream Partners: Operator with 67% interest
Dong E&P (UK) Limited: 18.3% interest
Chevron North Sea Limited: 7.2% interest
OMV (UK) Limited: 7.5% interest
Contractors:
px Group: Operation and maintenance contract (O&M)