Oil&Gas
Cambo Field – Block 204/5a
2018-08-27 20:01  点击:17
VIP:1级

Project Profile


Location: Block 204/5a, 136 km west of the Shetland Isles
Water depth: Approx. 1,090 metres
Start-up Year: -

Cambo was discovered originally back in 2004 when an exploration well encountered a 50 metre Paleocene oil column which was further appraised later. Cambo was drilled with the West Navion drillship. Cambo is north of Foinaven, Schiehallion and the 1999 Suilven oil discovery.

Appraisal well Cambo 3 in block 204/10 was drilled in April-July 2009.

Appraisal well Cambo 4 in block 204/10a was drilled in waters of 1,080m using the drillship Stena Carron in June 2011.

Cambo 5 exploration well is one of the deepest to be drilled in the UK offshore sector.


Operator:

Siccar Point Energy: Operator with 100% interest (January, 2017)


Contractors:

Stena Drilling: Drilling contractor

McNulty Offshore: Driling contractor

Hess Corporation: Drilling contractor

Baker Hughes (BHGE): Support for appraisal and early production phases (November, 2017)

Ocean Installer: Support for appraisal and early production phases (November, 2017)
联系方式