obite, Ubeta and Rumuji (o.U.R) Pressure Gas Pipeline
2017-12-21 15:00  点击:1
VIP:1级

Project Profile


Estimated Value: US$3 billion
Completion Year: 2011
Location: Rivers State, Nigeria

The Obite-Ubeta-Rumuji field upgrade and gas pipeline is a large gas reserve project. The project involves the construction of pipelines to increase gas transportation capacity to NLNG. The scope of the project includes the following:

IBEWA: Production cluster - 7 gas wells, 1 spare slot.
OBITE-IBEWA: 12\" HP gas line plus electric/fibre optic cabling.
OBITE: Treatment centre.
OBITE-OBAGI: 12\" HP gas line, 6\" condensate line. Electric/fibre optic cabling.
OBAGI: Flow station
OBAGI-RUMUEKPE: 12\" gas line
Obagi production start-up - 1996 - 60kb/d
Obagi production 2004 - 76 kboe/d. Production increase through debottlenecking.
Obagi upgrade targeted for 2008 start-up for further 32 kboe/d

The project also includes the construction of 47 km of line pipe needed for further development of assets in the Niger Delta. The specifics cover 40 km and 7 km of 36-inch diameter line made up of two different pipe thicknesses.

Pipeline design parameters

• Pipeline Code: ASME B31.8 Class 600
• Service: Treated Hydrocarbon Gas
• Length: 45,5 km
• Design Life: 30 Years
• Design Pressure: 95 barg
• Outside Diameter: 1066.8mm (42 inches)
• Material: API 5L-X65
• Wall Thickness: 25.4mm for location class 2+3 19.1 mm for location class 1
• Installation: Buried (Above Ground within process plant)
• Min. Depth of Cover: 900mm for landlines (1+2) 1200mm for landlines (3) 1500mm for swamps; 4500mm below Low Level Water Surface for Sambreiro river crossing
• Concrete coating: required at water crossings (incl. seasonal swamp)
• Cathodic Protection: Impressed current scheme
• Pipeline includes: 2 pig traps and 2 hot taps



Operators:

Total

Nigerian National Petroleum Corporation

CNOOC

Petrobras

Contractors:

Saipem Nigeria

Desicon Group

Ponticelli

Fastbells Services Ltd.: Pipeline jobs executed:
• Installation of Field Instruments (pressure gauges and transmitters, temperature gauges and transmitters, Thermowells, ESD valves, actuators, HPU and allied piping accessories for the TOTAL 42\" OUR Gas Pipeline at the Nodes (Obite, Ubeta, Rumuji) - ongoing.
• SCADA upgrade and telecom integration for the TOTAL 42\" OUR gas pipeline - ongoing.
• Procurement of 9” and 7”, 110V Dewalt grinding machine for the OUR gas pipeline project (OML 58) for ZBJVL (ZB Joint Venture Limited)
• Procurement of electrical cables and main power distribution accessories for the OUR Gas Pipeline (OML 58) for ZBJVL (ZB Joint Venture Limited).

B. G. Technical: to carry out the pipeline pre-commissioning
- range of tools and equipment being deployed include onsite nitrogen membrane unit, high volume - high pressure pumps, industrial compressors (high flow rate, high pressure) etc.