Project Profile
Location: near Rosebank oil discovery, West Shetland
Blocks: 213/25b and 25c, P.1192
Resources: 20(P90) 104(P50) 324(P10) mmboe (post-drill volumes)
Relinquishment date: 8 November 2016
T213/25c-1V well was drilled to test the North Uist Prospect as a primary target and the Cardhu prospect as a secondary target. The well was spudded on the 25/03/2012 reaching total depth on the 13/01/2013 of 4,730m TVDSS, satisfying the licence drilling commitments. The well encountered operational challenges including five sidetracks and high well bore temperatures.
Operators:
BP Exploration Operating Company Limited: 47.5% interest
Nexen Petroleum U.K. Limited: 35% interest
CIECO Exploration and Production (UK) Limited: 6.25% interest
Faroe Petroleum: 6.25% interest
Idemitsu Petroleum UK Ltd: 5% interest
Contractors:
Stena Drilling: Drilling drillship Stena Carron
Adept Solutions: Contract with Nexen Petroleum UK Limited to install its flexible hydrocarbon accounting system, Axis allowing operators to manage multiple product lifting regimes from numerous off-take points – encompasses a range of key functions, including stock management, forecast and actual production, calculation of partner lifting entitlements and lifting schedules.