Oil&Gas
Bilbao LNG Terminal
2017-12-21 15:00  点击:4
VIP:1级

Project Profile




Location: Bilbao, Spain
Storage capacity: 300.000 m3
Production rate: 800.000 Nm3/h

When the Bilbao regas and power facility was first conceived, the idea was that it would be supplied with LNG from Trinidad. However it now receives gas from a wide variety of sources.

Operators:

Bahía de Bizkaia Gas: Operator

Enagas

Ente Vasco de la Energ a — EVE

Iberdrola

Contractors:

Joint Venture for EPC contract:

Sofregaz
SN Technigaz
Initec
联系方式