Johan Castberg (Formerly Skrugard/Havis) Block 7220/7 - PL 532 - Barents Sea
2020-08-03 09:22  点击:4
VIP:1级

Project Profile


Location: Barents Sea, Norway
Reserves: 400 million to 600 million barrels
Depth: 1,198 ft (365 m)
Start-up Year: 2022

The Havis discovery is located in Production License 532 in the Barents Sea. Statoil serves as the operator of PL 532 with a 50% stake; while Eni holds 30% and Petoro hold 20%. Well 7220/7-1, drilled by the Transocean Barents (UDW semisub), proved a 157-foot (48 metre) gas column and a 420 foot (128 metre) oil column. The operator estimates that the volumes in Havis are between 200 to 300 bbl of recoverable oil equivalents. The well reached a vertical depth of 7,218 feet (2,200 metres) in a water depth of 1,198 feet (365 metres). based on 2016 estimations, the proven volumes in Johan Castberg are estimated to 400-600 million barrels of oil. 
Statoil has distributed a proposed impact assessment programme for the largest field yet to be developed on the Norwegian continental shelf (NCS). While development plan has yet to be submitted, the field is expected to be developed using a floating, production, storage, and offloading (FPSO) unit. (September, 2016)

Operator:

Statoil: Operator with 50% interest
Eni: 30% interest
Petoro: 20% interest
Contractors:
Baker Hughes: Contracted to provide turbomachinery equipment
Siemens: Contract to engineer, manufacture and commission SGT-750 gas turbine 
Kvaerner: Construction and installation of the topside structure for the FPSO
Ocean Installer: Marine operations
Subsea 7: Design, coating, fabrication and installation of flowline. 
Oceaneering: Supply umbilicals 
Aker Solution: Construction of the hull and integrated living quarters
SBM Offshore: To deliver a large-scale turret mooring system
Aker Solutions: Will supply the subsea production system and design the topside of the floating production, storage and offloading (FPSO) facility. 
Sembcorp Marine: Hired for the construction of the hull and integrated living quarters for the FPSO 
FPE Sontum: Hired to provide fire extinguishing systems for the Johan Castberg FPSO
Aker Solutions: Early-phase studies and concept study
Seadrill: Drilling using Seadrill semisub West Hercules
Sevan Marine: Study of the potential application of a Sevan FPSO 
Transocean: Drilling rig contract
Kongsberg Oil & Gas Technologies: Conceptual study and pre-FEED work
IKM Ocean Design: Contract to be responsible for Subsea – Integration Pre-FEED and FEED Project plus options.The contract includes Pre-FEED and FEED of pipelines, risers, cables, tie-ins and related structures on the Johan Castberg field. Furthermore, detail design and follow-on engineering are included as options along with EPC of pipeline related structures. The contract has a duration of two years for the completion of Pre-FEED and FEED design, covering the SURF part of the development. Including options, the total contract period and value could extend to 7 years and NOK 200 million (US$22.5 million), respectively. The engineering work will start immediately and will be run out of IKM’s Lysaker office. (January 2016)
A consortium of GE and Halvorsen: Hired to provide seawater sulfate removal system. 
Sub-contractors:
Aker Solutions: delivery of the modules for water and chemical injection.
Drydocks World: Construct parts of the turret mooring system for an FPSO.
联系方式