Oil&Gas
Livorno (offshore FRSU) LNG Terminal (Toscana)
2019-03-29 09:08  点击:3
VIP:1级

Project Profile


Value: US$865 million
Location: Offshore Livorno
Start-up Year: October 2012
LNG: 3 million tonne/year
Storage Capacity Gas: 137,500m³

The project involves the construction of a floating regasification terminal, built by modifying a gas ship, located 22 kilometres from the Tuscan coast and connected to the mainland by a pipeline of about 30 kilometres to send the gas to the national grid. The terminal will have a regasification capacity of 3.75 billion cubic metres per year corresponding to 4% of national demand, an average of regasification capacity of 11 million cubic metres per day and a storage capacity of 137,500 cubic metres of LNG. The terminal will allow the berthing of LNG ships with capacities of between 65,000 and 138,000 cubic metres of LNG.


Operator:

OLT Offshore LNG Toscana, which is a joint venture company consisting of:

Uniper Global Commodities: 48.24%

Iren Group: 49.07% interest

Golar LNG Limited: 2.69% interest

Contractors:

Dubai Drydocks: LNG carrier conversion into FSU

Max Streicher GmbH: Pipelines and onshore equipment

Saipem: EPC contract