Project Profile
Location: PL530, Norwegian continental shelf, North Sea
The area in this license consists of the blocks 7123/6 and 7124/4. The well will be drilled about 100 kilometers north of Hammerfest and about 70 kilometers northeast of the Goliat field.
Production license 530 was awarded in the 20th licensing round. This is the first well to be drilled in the license.
The permit is contingent upon the operator securing all permits and consents required by other authorities prior to commencing drilling activity.
Operators:
GDF Suez: 30% Interest
Rocksource: 20% Interest
Front Exploration: 20% Interest
North Energy: 20% Interest
Repsol: 10% Interest
Contractors:
Aker Drilling A/S – Aker Barents drilled the well