Project Profile
Value: US$250 million
Start-up Year: 2013
Location: Central North Sea, UK, Block 30/14 and Offshore Norway, Norwegian Continental Shelf, Block 1/5a
Production Start-up: 2017
Production: 10,000 bopd
The Flyndre and Cawdor fields are to be jointly developed. The plan of development is for the fields to be tied back to the Talisman\'s Clyde platform, which is located 30km away. The development is expected to deliver 13m bbl of oil over its lifetime. The Flyndre is located in UK blocks 30/14, 30/13 and Norwegian block N1/5, about 290 kilometres south-east of Aberdeen, while Cawdor is in blocks 30/14 and 30/13. First oil began in March 2017.
Operators:
Flyndre
Maersk Oil: Operator with 81.67% interest
Talisman Sinopec Energy UK: 18.33% interest
Cawdor
Maersk Oil: Operator with 71.15% interest
Talisman Sinopec Energy UK: 28.85% interest
Contractors:
ProServ: Provide electro-hydraulic multiplex subsea control systems
Aker Solutions: Maintenance and modifications services for the offshore platform
Harkand: Contract to deliver subsea support services, including a commissioning support campaign. Under the contract, the Aberdeen office of the global inspection, repair and maintenance company will oversee the mobilisation of the the Harkand Atlantis and Harkand Da Vinci dive support vessels. The Flyndre campaign will see personnel carrying out choke valve replacement work as well as delivering umbilical tie-in operations. (March 2016)