South Hook LNG Terminal
2019-04-02 08:55  点击:11
VIP:1级

Project Profile


Value: US$1619 million  
Location: Milford Haven, Pembrokeshire, Wales, UK
Processing capacity: 15.6 million tonnes of LNG a year
Production capacity: 21 billion cubic metres of gas a year
Start-up year: 2013

The South Hook Terminal, a part of the Qatargas 2 integrated value chain, is the largest Liquefied Natural Gas re-gasification terminal in Europe.  The terminal has successfully completed the build and commissioning of Phase 2 and is complete, and will be able to provide the UK with a significant proportion of its natural gas requirements.  A state of the art fleet of double-hulled ships brings the LNG from Qatar\'s immense gas field, to the safe, deep anchorage provided in Milford Haven.  The South Hook re-gasification Terminal is where the LNG is converted from a liquid back to a gas and is then delivered to the UK\'s homes and businesses via the national grid.  Amec has the three year term services contract at Terminal in south Wales.

South Hook LNG terminal in the UK is scheduled to receive a cargo from Qatar in July 2016. (June, 2016)

Gas supply from the South Hook LNG terminal to the UK’s national grid on 29th August 2016 was around 37 mcm/day.

Operator:

South Hook LNG Terminal Company Ltd.

Qatar Petroleum (QP): 67.5% interest

ExxonMobil: 24.15% interest

Total: 8.35% interest


Contractors:

Joint Venture for three year term services contract:
AMEC 
Black & Veatch Corp 