Project Profile


Value: US$400 million , US$655 million (Phase 2 Buzzard)
Location: Outer Moray Firth, central North Sea, 100km northeast of Aberdeen, UK
Water Depth: 100m/ 330ft
Production: 160-170,000 boepd (Buzzard)
Start-up year: 2020 (Buzzard)


The Buzzard field is located in the Outer Moray Firth, central North Sea, 100km northeast of Aberdeen, UK, and 55km from the coast at Peterhead. The field straddles two licences – P.986 (blocks 19 / 10 and 20 / 6) and P.928(S) (blocks 19 / 5a and 20 / 1S. The water depth in the area is about 100m. The Buzzard Phase II Development Project, which is being carried out in partnership with Aker Solutions, Subsea7, Worleyparsons and Maersk Drilling, is estimated to cost over US$655 million and will involve the drilling of at least six new wells.

The Scott platform, which came on stream in 1993, produces crude oil and natural gas from the Scott, Telford and Rochelle fields. Scott is located about 188 km (116 miles) northeast of Aberdeen in 142 metres (465 feet) of water. Oil from the platform is exported via the Forties pipeline to the Kinneil Terminal in Scotland. Natural gas is exported via the Sage pipeline system. Nexen Petroleum is the operator of all three fields.

RockRose Energy plc signed non-binding headline terms and a period of exclusivity with Maersk Oil to buy its non-operated interests in Scott and Telford fields. (September, 2016)

Operators:

Nexen Petroleum: Operator with 43.21254% interest (Buzzard Field), 41.88% interest (Scott Field)
and 80.40% interest (Telford Field)

Dana Petroleum: 20.64% interest (Scott Field) and 29.89122% interest (Buzzard Field)

Chrysaor: 21.73307% interest (Buzzard Field)

Edinburgh oil and gas: 5.16317% interest (Buzzard Field)

MOL Group: 21.83% interest (Scott Field) and 1.59% interest (Telford Field)

Edison (bought from Apache Corporation, May 2015): 10.47% interest (Scott Field) and 15.65% interest (Telford Field)

RockRose Energy: 5.16% interest (Scott Field) and 2.36% interest (Telford Field)


Contractors:

Aker Verdal: Constructing the jacket structures

Burntisland Fabrications: Management, fabrication and provision contract

CB&I: Designed the platform

Diamond offshore: Drilling rig

Dron and Dickson: Carry out electrical maintenance

Hertel: EPC and Living quarters contract

Heerema: Installed deck and bridge structures

RBG: Fabric maintenance, deck and mechanical services

Saipem: Carry out pipelay operations

Wood Group PSN: Deliver operations, maintenance and technical support services (Renewed April 2016)

ABB UK: Service contract with leading oil and gas operator CNOOC Nexen to deliver non-disruptive lifecycle performance of the integrated control and safety system (ICSS) onboard the Buzzard platform

Harkland: ROVSV inspection services work

Sentinel Marine: A contract for the provision of rescue and recovery services for four years. This work will be carried out by the multi-role emergency response and rescue vessel (ERRV) Fastnet Sentinel. The contract also includes options to extend. (Feb, 2017)


Subcontractors:

Ocean Installer: Installation and recovery of a pipeline initiation system