Project Profile



Value: Undisclosed
Location: Eastern Siberia region of Russia
Peak Production: 140 kbopd from 430 production wells

The VC oil & gas field is planned to produce a plateau production of 140-kbopd from 430 production wells, and there will be 215 water injection wells. The field development will involve total 645 wells distributed over 75 well pads. The reservoir is about 1700m depth and initial reservoir pressure is about 2,250 psia, with a reservoir temperature from 12C to 20C.

The project award marks the first contract between VCNG and KBR and builds upon the existing relationship between TNK-BP and Granherne, a KBR subsidiary. Work on the project is already underway.

Operator:

Verkhnechonskneftegas: Operator with 100% interest

Contractors:

KBR Russia: FEED contract