Oil&Gas
Production Licence 380
2017-12-21 15:00  点击:1
VIP:1级

Project Profile


Value: Undisclosed
Location: About 7 km southwest of the Midgard field
Water Depth: 269 metres

The well is the first exploration well in Production Licence 380. The licence was awarded January 6 2006 after the 2005 APA round. The well was drilled to a vertical depth of 2972m below sea-level and was terminated inside the Ile Formation of Middle Jurassic age. The water depth at the well location was 269 metres. The well will be permanently plugged and abandoned.

Operators:

Det norske oljeselskap ASA: Operator with 70% interest

VNG Norge AS: 30% interest

Contractors:

Songa Offshore: Drilling rig facility
联系方式