Project Profile
Location: Bay of Bengal, offshore Bangladesh
Area: 4,475 sq km
Water Depth: 200 m
Start-up Year: -
Block SS-11 encompasses 4,476 sq km in the Bay of Bengal. Most of the water is 200 m deep or less. CGG has completed a 2D seismic acquisition program offshore Bangladesh for KrisEnergy. The Binh Minh 2 vessel covered 3,146 km in block SS-11.
Operators:
Santos Sangu Field Ltd.: Operator with 45% interest
KrisEnergy (Asia) Ltd. (wholly owned subsidiary of the KrisEnergy): 45% interest
Bangladesh Petroleum Exploration & Production Co. Ltd.: 10% interest
Contractors:
CGG: 2D seismic acquisition program using the Binh Minh 2 vessel