Project Profile
Value: $500 Million
Startup Year: 2010
Location: Nigeria
The project will see the development, engineering, fabrication and installation of several shallow water platforms and associated pipelines. The workscope includes redevelopment of existing Adanga production platform; provision of new Adanga riser platform and bridge; installation in 10-40 metres of water of new 10km pipeline between Adange and Antan; provision of new production platform at Oron; and provision of minimal deck facility for Adanga North extended well test, with associated 5km flexible flowline in 10 metres of water. Currently, proved and probable reserves are put at 16.3m bbl and peak production of 15,000 b/d is expected. In 2014 50,000 bopd was achieved from OML 128.
OML 123 contains nine producing oil fields (Adanga, Oron West, North Oron, Ebughu and extensions, Adanga North Horst, Inagha, Kita Marine, Bogi and Mimbo), one undeveloped oil field (Antan) three unappraised oil discoveries (Adanga East, Adanga West and Ebughu NE-A).
Operator:
Addax (Nigeria)
Contractors:
Petrofac (Nigeria)
SBM (Single Buoy Moorings)
Global Petroleum Resources