Oil&Gas
Hai Yang Shi You 117 FPSo
2017-12-21 15:00  点击:2
VIP:1级

Project Profile


FPSO Type: Monohull - New build

Capacity: 1.8 MMbl,cm

Risers: 1

Mooring legs: 9

Mooring system: Tower Yoke

Water Depth: 23 metres

Field: Penglai field, China

Field Operator: CNOOC

Value: -

FPSO Operator: CNOOC

Contractors:

Shanghai Waigaoqiao Shipbuilding: Design, partial procurement and construction of the FPSO Hull

SSPL and SMOE: Provide the secondary structural steel materials and fabricate 15 FPSO topside modules, one flare tower and seven pipe-rack modules, as well as integrate the facilities onto the hull of the FPSO vessel and commission the facilities prior to the vessels departure for China.

Fluor: Design of the Topsides Modules

Aker: Pusnes Offloading System

Bluewater: Soft Yoke Tower Mooring System (SYMS)

Emerson: Control System & Safety system
联系方式