Project Profile
Value: Undisclosed
Location: South China Sea, 124 miles offshore the east coast of Peninsular, offshore Malaysia
Length: 16 mile (pipeline to the existing Guntong E platform for processing)
Start-up Year: -
ExxonMobil has started production from the Telok natural gas field, located offshore Malaysia in the South China Sea. The Telok development will help meet increasing demand for natural gas in Peninsular Malaysia. The development concept of “design one, build many” was utilised to efficiently develop the project and shorten construction and installation timelines, allowing Telok to be completed on schedule and within budget. The Telok A platform is the first phase of the Telok natural gas project, which when completed will consist of two four-legged unmanned gas satellite platforms. Full well stream gas will be produced via a new 16 mile pipeline to the existing Guntong E platform for processing. A total of 14 development wells are planned for the Telok A and B platforms. The Telok gas field is located about 124 miles offshore the east coast of Peninsular Malaysia. The field was developed under a gas production sharing contract and is a 50:50 joint venture between ExxonMobil, the operator and PETRONAS Carigali Sdn Bhd.
Operators:
ExxonMobil: Operator with 50% interest
PETRONAS Carigali Sdn Bhd: 50% interest
Contractors:
Malaysia Marine & Heavy Engineering (MMHE): Procurement, fabrication, onshore testing, load-out and offshore hook-up and commissioning of 2 topsides and the corresponding 2 jackets to support the platforms