Oil&Gas
Heera Redevelopment Project
2017-12-21 15:00  点击:2
VIP:1级

Project Profile


Value: US$300 million
Location: Off the coast of India’s west coast
Start-up Year: April 2014

The project includes the laying of 14 segments of liquids and gas lift rigid subsea pipelines totalling 137.5 kilometres. Ten pipeline segments are required for the Heera field. Seven flexible water injection subsea pipelines totalling 23.25 kilometres will also be required for the Heera field. Topside modifications will be carried out on structures including the HRC process platform at the field and the WIN water injection platform.

Following bidders for the EPC contract include Punj Llyod with a bid price of US$190.2 million, Valentine Maritime with a bid price of US$191.7 million as well as a consortium consisting of Hyundai Heavy Industries, Great Offshore and Leighton Welspun and a bid from Swiber with a price of US$262.5 million

Operators:

ONGC: Operator with 100% interest

Contractors:

Consortium for EPC of topsides contract:

Technip
AFCONS Infrastructure Ltd
TH Heavy Engineering Berhad

Larsen & Toubro: EPCI of three 12 slot wellhead platforms

Leighton Welspun: Subsea and topsides applications

Petrovietnam Technical Services Corporation Mechanical & Construction (PTSC M&C): Build the topsides for a process platform

Sub contractor:

Unique Hydrographic Systems: Seaflex Air Lift bags ordered by Leighton Welspun