Bokor Redevelopment Project
2017-12-21 15:00  点击:1
VIP:1级

Project Profile


Value: Undisclosed
Location: Baram Delta area 45 km (28 miles) offshore Lutong, offshore Sarawak, Malaysia
Depth: approximately 67 m (220 ft)
Start-up Year: 2015

The Bokor oilfield, operated by Petronas Carigali Sdn Bhd (Petronas), was discovered in the 1970s. It is in the Baram Delta area 45 km (28 miles) offshore Lutong, Sarawak, Malaysia, in water depth of approximately 67 m (220 ft). There are three drilling platforms in the field: BODP-A, BODP-B, and BODP-C. The asset is being redeveloped by the Bokor Project Management Team (BPMT), a gainshare alliance between Petronas and Schlumberger. BPMT is to develop initiatives to improve field performance, and, in 2007, it began a review of artificial lift options. A team was mobilised to identify wells that would benefit most from a change in lift method; select the optimum technology; and provide engineering and project management to implement the changes. Key objectives for the project were to improve economics through enhanced production and reserves recovery, and to enable the reallocation of currently consumed lift gas to other wells.


Operators:

Bokor Project Management Team joint venture: Operator with 100% interest
Petronas
Schlumberger


Contractors:

Aker Solutions: FEED contract for re-development project

Magseis: Contract for seabed seismic acquisition using the MASS system and vessel “Artemis Athene”. The project entails a high density 3-D survey of approximately 100km2 at the Bokor Field. (December, 2015)

Malaysia Marine and Heavy Engineering: A contract to build an offshore processing platform for Petronas’ Bokor project, offshore Malaysia. MMHE will be responsible for the engineering, procurement, construction, installation and commissioning of a central processing platform (CPP) for the Bokor Phase 3 redevelopment project by Petronas Carigali. (April, 2017)