Oil&Gas
Miano Gas Field
2017-12-21 15:00  点击:1
VIP:1级

Project Profile


Location: Sindh desert, Pakistan
Recoverable Reserves (1P): 660.512 bcf gas (18.7 bcm) ; 0.354 million barrels NGL
Daily average production: 104.426 mmscf gas (2.96 mmscm) ; 46.063 barrels condensate (July 2015 - June 2016)

Miano gas field is situated in Sindh desert. Raw gas from the field’s six producing wells is processed at Kadanwari Gas Plant before its supply to SSGCL. The condensate is sold to National Refinery Limited. A total of 19 wells have been drilled in the field, out of which eight wells are currently on production. To ensure contractual delivery pressure of gas sales to SSGCL, Miano Compression Project was commissioned in October 2010.

Operators:

OMV: Operator with 33.4% interest

Pakistan Petroleum Limited (PPL): 15.16% interest

OGDCL: 17.71% interest

Eni: 33.33% interest

Contracts:

Stag Energy: Legal predevelopment activities

Descon Engineering: Planning & Field Engineering
联系方式