Project Profile
Value: $3500
Startup Year: 2016
2015 Operating Capacity: 3,72 billion litres per annum
The project will see the construction of a multi-products pipeline between Durban and Johannesburg. The pipeline will enhance Transnet Pipelines\'s capacity to service the transport needs of refined petroleum products such as petrol, diesel, and jet fuel along the Durban-Gauteng corridor.
Operator:
Transnet
Contractor:
Contractors
Fluor (South Africa)
Group Five
Spiecapag
Arup
WorleyParsons (South africa)
Siemens