Project Profile
Value: $150
Startup Year: 2011
Supply: 100 mmscf/d (Million standard cubic feet per day)
The project will see the construction and laying of a 107km gas pipeline with a diameter of 24in, which will supply gas from the Addax platform offshore to the 561MW gas power plant being built at Ikot Nyong, near Calabar in the Cross River State.
Operator:
Government of Nigeria
Contractor:
Kaztec Engineering LTD