Kepala Burung Production Sharing Contract
2017-12-21 15:00  点击:1
VIP:1级

Project Profile


Value: Undisclosed
Location: Sorong area, West Papua
Start-up Year: March 2012
Upstream condensate reserves: 137 barrels of condensate per day
Peak production (per annum): 5.867 million standard cubic feet per day

In October 2011, the North Klalin-1 well was discovered by the subsidiaries Petrogas (Basin) Ltd. and RHP Salawati Basin B.V. Contra and it is located in the Sorong area, West Papua. The North Klalin-1 well tested 5.867 million standard cubic feet per day of gas and 137 barrels of condensate per day on a 24/64\' choke.

The North Klalin-1 well has been put on production on 26 March 2012 with an initial production rate of approx. 1.56 MMSCFD of gas and 107 BCPD on a gross basis. Two delineation wells, North Klalin-2 and North Klalin-3, are planned to be drilled later in 2012 and if successful, production acceleration/development of the field is expected to be achieved. The company through PBL and RHPSB has an aggregate 60% working interest in the Basin PSC. The other partners are PetroChina International (30%) and PT Pertamina Hulu Energi (10%).

Operators:

Petrogas (Basin) Ltd. & RHP Salawati Basin B.V.: Operator with 60% interest

PT Pertamina Hulu Energi: 10% interest

PetroChina International: 30% interest