Yadana & Badamyar Gas Project
2017-12-21 15:00  点击:7
VIP:1级

Project Profile


Value: US$1,000 million.
Location: Andaman sea, Myanmar
Gas production: 760 million cubic feet of gas per day
Start-up Year: November 1998

Yadana gas field is located in the Andaman sea, around 60km offshore from the nearest landfall in Myanmar. The project consisted of developing offshore as well as onshore facilities. Platforms and subsea gas pipelines have been developed offshore. For onshore support, a land pipeline and a control and maintenance centre along with a gas metering station have been developed. Total S.A. (Total), the gas field operator, is engaged in the development of Yadana offshore field and transportation of gas from the production unit to the Thai border.

With the gas discovery in 1980, the Yadana gas field development was divided into three phases. Phase 1 (1992 -1994) started with a technical survey of the field to check for the feasibility of the project. Total and MOGE (Myanmar Oil and Gas Enterprise), a state owned company, entered into the contract for developing the field in 1992. The reserves at Yadana were confirmed in 1993 and further gas sale negotiations were initiated with the Petroleum Authority of Thailand (PTT). The first filed survey was conducted in 1994 for exploring options for a land pipeline route. During 1995, contract for supplying gas to Thailand was signed with PTT. As per the production sharing contract, MOGE exercised its option to take a 15% stake in project in 1997. During the same year, the land pipeline was laid. Phase two included the construction and design of production facilities and transmission by the Moattama Gas Transportation Company (MGTC). Under phase three, the gas was produced by partner companies and transmitted by MGTC. Supply of gas from Yadana to Myanmar domestic market begun in 2001.

The Badamyar project, located offshore 220 kilometers south of Yangon in the Republic of the Union of Myanmar. The Badamyar project involves the installation of a new wellhead platform connected to the Yadana production facilities, and the drilling of 4 horizontal wells to develop Badamyar gas field as a satellite of Yadana. The project also includes a new compression platform. It was launched in mid 2014.

Infrastructure & Pipelines:

The oil field has two well-head platforms consisting of seven wells. It has one accommodation platform and one production platform. Other offshore facilities also include a 346km subsea pipeline and a 63km onshore pipeline connecting through the Tenasserim district to the Thai border. In December 2007, a manifold compression platform was also installed for an initial project development plan ensuring targeted gas production levels and timely delivery of gas. The project has a 409km onshore gas pipeline operated by Total in the Myanmar territory, in addition to 240km in Thailand owned by PTT Plc. The offshore pipeline of the project is 65km on land, covering the point from where the subsea gas pipeline emerges onto dry land at the Daminseik and the Thai frontier. Furthermore, the pipeline is connected to the gas grid for supplying gas to Thailand\'s Ratchaburi and Wang Noi electric power plants in the Bangkok region.

Production:

The production facilities became fully operational during 1998 and production began at the end of 1998. The field was then producing 525 million cubic metres per day. During 2007, the average output from the field was 760 million cubic feet of gas per day. Out of total output, around 660 million cubic feet (mcf) per day was being supplied to PTT and remaining to Myanmar. The project\'s operator, Total, took responsibility for the surveys, technical choices, construction of the infrastructure and operating them during its production phase, through its subsidiary in Myanmar. Under the conventional production sharing contract, the four investors include Total (31.2%), Unocal Corporation, a subsidiary of Chevron (28.3%), PTT EP (Petroleum Authority of Thailand – Exploration & Production: 25.5%), and MOGE (Myanmar Oil and Gas Enterprise: 15%) The project involved an investment of around US $1bn. The total investment included US$600m for the pipeline and the remaining for offshore installations.


Operators:

Total: Operator with 31.2% interest

Unocal Corporation: 28.3% interest

PTT EP (Petroleum Authority of Thailand – Exploration & Production): 25.5% interest

MOGE (Myanmar Oil and Gas Enterprise): 15% interest


Contractors:

Technip: contract to perform the front end engineering and design (FEED) work for the Yadana Expansion project. Technip is due to complete its FEED work on first quarter 2014

Bibby Offshore Singapore (BOS): Contract with the Moattama Gas Transportation Company (MGTC) to provide ROV pipeline inspection, remedial work and associated project management on its South East Asia asset offshore Myanmar. Bibby Offshore will supply its DP2 ROV support vessel, Bibby Spring. The 60 day project started on 16 February 2015 and will be carried out in water depths of up to 146 metres.


Sub-contractors:

Seabed Scour Control Systems (SSCS): Quantity of Weighted Frond Mats to Bibby Offshore’s Singapore division for installation along one of the pipelines on the Yadana field in the Andaman Sea. The Mats, delivered on behalf of Total Myanmar, are meant to provide freespan rectification and future protection from scour in water depths of approximately 50 metres. Bibby Offshore executed the deployment of the Mats from the DP2 ROV support vessel, Bibby Spring, utilising the SSCS installation frame and the Quasar Work Class ROV.